"Difference in quality"

Asfozinc

Guaranteed Content (&W/W)
Total Nitrogen (N) 5
Nitrate Nitrogen (N) 5
Water Soluble Phosphorus Pentoxide (P2O5) 25
Water Soluble Zinc (Zn) 5
Chloride Cl % 1,09

USAGE, PLACE AND DOSE

PLANT APPLICATION FROM THE LEAF DRIP
Citrus It is applied before flowering. 3 more applications are made every 30 days 200-250 cc/da
Apple, pear, pomegranate, quince, kiwi The first application is made when the plant reaches the size of 1-2 cm from the leaf, 3-4 more applications are made every 15 days. 200-250 cc/da
Walnut, hazelnut, peach plum, cherry, apricot The first application is made when the plant reaches the size of 1-2 cm from the leaf, 2-3 more applications are made every 15 days. 150-200 cc/da
Vineyard, (grape) The first application is made when the shoots reach a length of 10-20 cm.  3 more applications are made with 15 days intervals 3 more applications are made with 15 days intervals. . 150-200 cc/da
Olive The first application is made when the plant reaches the size of 1-2 cm from the leaf, 2-3 more applications are made every 15 days. 100-200 cc/da
Sugar beet The first application is made after dilution. 2 more applications are made with an interval of 15 days. 150-200 cc/da
Cotton, potato The first application is made when the plant reaches a length of 15-20 cm. 2 more applications are made with 15 days intervals. 150-200 cc/da
Corn, sunflower The first application is made when the plant reaches a length of 15-20 cm. 200-250 cc/da 500 cc / 1 lt
Melon watermelon, cucumber, squash The first application is made when the plant reaches a length of 15-20 cm. 2 more applications are made with 15 days intervals 150-200 cc/da 500 cc / 1 lt
Wheat, barley, paddy During the tillering and the bolting period 100-200 cc/da
Banana 2-3 applications every 15 days from early spring 150-250 cc/da
Strawberry The first application is made when the plants start to come up, 2-3 more applications are made with an interval of 15 days. 150-200 cc/da 500 cc / 1 lt
Lentils, chickpeas The first application is made when the plant height is 5-15 cm. 1-2 more applications are made every 20 days. 150-200 cc/da
Artichoke, Celery Cauliflower The first application is made when the plant height is 5-15 cm. 2-3 more applications with 15 days intervals 150-250 cc/da 500 cc / 1 lt
Soy, beans, peanuts, peas The first application is made when the plant height is between 5-10 cm. 3 more applications are made with 15 days intervals. 150-250 cc/da
Onion, garlic, carrot The first application is made when the plant height is between 5-10 cm. 2-4 more applications are made with an interval of 15 days 150-200 cc/da
Tomato, pepper, eggplant The first application is made 10 days after the seedling planting, then 2-3 more applications are made with 15 days intervals. 100-300 cc/da 500 cc / 1 lt

 

Asfozinc